Sunday, November 21, 2010

Nose Painful Swelling

OG (final week 46)

The weather has become spührbar uncomfortable. The Masons still give gas. They also want to get our house to the onset of winter, which is next Wednesday (24/11/2010) arrive, tight. Made it was this week a lot. In the floor almost the entire interior walls have been bricked. Even the Lord on the front gable and the gable at the rear of the building have been bricked. The brick work is progressing. The right side wall of the house is already finished clinker. The entire EC has already received its brick facade. Now only the Lord gables and the entire left side wall of the house. If the work is done, the roofers are already at the door to further their work to lead.

Agenda KW 47:
- that support the inner walls
- brick facing of the remaining exterior walls

view front

left outer wall

rear view

0 comments:

Post a Comment