Now it goes very fast? ?. After the excavation had been completed on the same day the material for the sole plate (foundation) was delivered. But these were only once until 12/10/2010 around on our property (perhaps used to adjust to the climate ???). In any event, on 12/10/2010, the company moved PLOEG & Bohl (which the ID-BAU Group belong to) and prepared the foundation. The next day delivered three truck's need, for our concrete foundation. It arrived the same evening is the first time can stand on our future "fast floor" (of course, still missing the floor and the tiles) and get a first impression of the size of the house. ID-BAU know even written out, which could result in completion of the sole plate, a false impression of the size of a house. This letter has written ID BAU, as some owners have experienced their sole plate to be too small. Also we were initially of the "virus" involved, but after if you have a functioning eingermaßen Imagination, has one the size of his house will be aware of. Nevertheless, I prefer the security measures taken again to the lengths and widths remeasured. Everything went according to (up to the millimeter).

Snowmobile Helmet Best Buy

earthworks

Our site after removal of the turf. The soil was also dug and filled with sand
here can already see the outline of the house. Tomorrow will be cast the sole plate.

After a long wait and some changes requested by our hand was on 10/05/2010 started building our house. Because our land is covered with a heavy overgrown grass, had to first be removed before the company could start with the HACK FIELD earthworks. After one day the soil is dug and filled the space with sand, so we get a first impression of the size of the house.

Wednesday, October 13, 2010

Refurbished Bath Tubs

Events in November Events in October

Tuesday, September 14, 2010

Denise Milani Play Game