Monster Engery Posters

sole plate




finished sole plate
Now it goes very fast? ?. After the excavation had been completed on the same day the material for the sole plate (foundation) was delivered. But these were only once until 12/10/2010 around on our property (perhaps used to adjust to the climate ???). In any event, on 12/10/2010, the company moved PLOEG & Bohl (which the ID-BAU Group belong to) and prepared the foundation. The next day delivered three truck's need, for our concrete foundation. It arrived the same evening is the first time can stand on our future "fast floor" (of course, still missing the floor and the tiles) and get a first impression of the size of the house. ID-BAU know even written out, which could result in completion of the sole plate, a false impression of the size of a house. This letter has written ID BAU, as some owners have experienced their sole plate to be too small. Also we were initially of the "virus" involved, but after if you have a functioning eingermaßen Imagination, has one the size of his house will be aware of. Nevertheless, I prefer the security measures taken again to the lengths and widths remeasured. Everything went according to (up to the millimeter).

0 comments:

Post a Comment