Today will be charged . What Ploeger & Bohl (daughter of ID-construction) in the last week managed? From the image you can see quite well that the masons have been real gas. With only two people have the Interior walls raised finished cased the stairs and the front of the house almost finished clinker. We are absolutely proud of the Masons. Top quality.

Agenda week 44:

- brick facing a side wall
- Delivery & concreting of the EC-ceiling
- Delivery & concreting of the stairs

Tuesday, October 26, 2010

How To Turn Gpsphone Saves To Vba Save

chimney + interior walls

Here you can see quite well how far the builders have already occurred. The chimney on the ground floor is raised and the complete interior walls in the EC. ID-building is currently right on schedule as far as the agenda KW 43rd Morning to begin the bonding linkers. We're totally excited to see how will look like.

chimney in the living room

Monday, October 25, 2010

Alcoholism Makes You Sterile?

North quartet

This formation of musicians of different generations, coming from Berlin, Bremen and Hanover, is an exciting, interactive project based on light, soft and subtle way of interpretation, is marked by boisterous game mood. The game is played fine grooving and soulful jazz with refreshing shades of traditional standards and modern compositions.

EK (ps)
Eike Wulf Meier (p)
Peter Schwebs (bs)
Christian Schönefeldt (dr)

Sunday, October 24, 2010

How To Get Air Locks Out Of Under Floor Heating

Agenda week 43

We want now to not only provide information about what has happened so far in our house, but also about what happen in any future week. Let's see if the ID-building promises and implement their plans always one: this will / should be finished in the meantime in any case in the coming week.

KW 43:
- completion of all interior walls in the EC
- completion of all exterior walls on the ground
- brick facing of two exterior walls

Friday, October 22, 2010

Orange Mobile Account Error 619

clinker


After we looked at an estimated 1,000 different clinker bricks and felt 1000 hours spent with the search for a suitable stone bricks, we have become quickly agreed to give this stone our house a beautiful, personal and warm atmosphere.

On Monday, 25.10. the clinker bricks delivered and immediately processed.

Monday, October 18, 2010

Brisket Rub For Crock Pot

Team-O!

Gerald Wilms (bs)
Christian High image (dr)
Jonathan Krause (sax)
Timothy Schrader (git)

... have fun!

Thursday, October 14, 2010

The Taste Of Blood When Coughing ]

masonry





After consultation with our supervisor Mr THUMS is begun with the masonry work until next week, namely on 10/21/2010. The reason is the waiting time is that ID-BAU is not on the principle works to start many construction projects simultaneously, and daily back and forth between the sites and to jump here, but aims to complete each trade at a construction site before the next construction . go

Small side information:
ID for each building has its own trade specialists. Normally, many construction companies are working with so-called "half-rounders," which can perform all the work, but this is not 100%. It is from these companies, the quantity in the foreground and not as in ID-BAU quality.

Monster Engery Posters

sole plate




finished sole plate
Now it goes very fast? ?. After the excavation had been completed on the same day the material for the sole plate (foundation) was delivered. But these were only once until 12/10/2010 around on our property (perhaps used to adjust to the climate ???). In any event, on 12/10/2010, the company moved PLOEG & Bohl (which the ID-BAU Group belong to) and prepared the foundation. The next day delivered three truck's need, for our concrete foundation. It arrived the same evening is the first time can stand on our future "fast floor" (of course, still missing the floor and the tiles) and get a first impression of the size of the house. ID-BAU know even written out, which could result in completion of the sole plate, a false impression of the size of a house. This letter has written ID BAU, as some owners have experienced their sole plate to be too small. Also we were initially of the "virus" involved, but after if you have a functioning eingermaßen Imagination, has one the size of his house will be aware of. Nevertheless, I prefer the security measures taken again to the lengths and widths remeasured. Everything went according to (up to the millimeter).

Snowmobile Helmet Best Buy

earthworks

Our site after removal of the turf. The soil was also dug and filled with sand
here can already see the outline of the house. Tomorrow will be cast the sole plate.

After a long wait and some changes requested by our hand was on 10/05/2010 started building our house. Because our land is covered with a heavy overgrown grass, had to first be removed before the company could start with the HACK FIELD earthworks. After one day the soil is dug and filled the space with sand, so we get a first impression of the size of the house.